DOE Launches “Speed to Power” to Boost U.S. Grid Capacity
On September 18, 2025, the U.S. Department of Energy (DOE) unveiled its “Speed to Power” initiative, designed to speed up…
On September 18, 2025, the U.S. Department of Energy (DOE) unveiled its “Speed to Power” initiative, designed to speed up…
Snohomish County Public Utility District (PUD), in Washington state, has partnered with Eaton, to launch the SnoSMART program, a $60…
In 2025, the substation automation market has reached a whopping $37.32 billion, hitting a new high.
What if the technologies best equipped to save the power grid are the very ones threatening to overload it?